79 research outputs found

    Maintenance Task as a Responsibility of a Professional Builder

    Get PDF
    This paper begins with a broad definition of building maintenance and an overview of its importance to all and sundry. It lays emphasis on the works and services department/maintpnance sections of some of government establishments in three key states of the south western part of the country namely Oyo, Osun and Ondo. This is also drne in such a way that it cuts across all the three arms of government · Federal, State and Local via the distribution of questionnaires and direct contact with the Directors of Works and Services and heads of maintenance units of these ministries/parastatals. Fifteen government establishments were covered in each state thereby bringing the total number to forty·five and this is with a view to finding the adequacy of representation of Professional Builders in the Works and Services/Maintenance sec.tions of these parastatals as well as the negative effect which the absence of these key professionals !Builders) might bring to the development of maintenance culture in the country. The results Indicated that 25 out of the 45 Directors of Wor~s and Services interviewed representing 55.56% are civil engineers while only 4 representing 8.89% are builders and out of these just two are Corporate Members of NIOB. On the other hand, 16 out of 45 heads of departments of the maintenance units representing 35.55% are civil engineers while 8 are builders and out of these only three are Corporate Members. This paper then concludes by offering suggestion on what the government, builders' registration council and the professional builders themselves can do sq as to give maintenance work the priority it deserves as well as having adequate representation of professional builders in the government establishment

    Direct Labour System of Project Execution in Nigeria: A Case Study of Osun State College of Technology,Esa-Oke

    Get PDF
    This paper reviews the activities of direct labour a pproach with particular reference to my place of work. That is, Osun State College of Technology, Esa-Oke. It starts by highlighting the origin of direct labour which had been in light operation since the 1930's to 1960's but which was popularised and given a full legal backing by the Sheu Shagari Administration in the late 1970's/early 1980's when the escalati o~ cost of the contracting system of project execution became a source of worry to them. The need for carrying out direct labour work is analysed,and the merits and demerits which the direct labour practice has over contract system are also fully elucidated. This is followed by the practice of direct labour in my place of work which is Osun State College of Technology , Esa-Oke and the necessary areas of improvement for the direct labour practice are laid down . Conclusion is then made by proierlng some useful sugges tions towards i n1p rove n~nt and better efficiency of the syste

    The Role of Trade Unionism in a Developing Economy

    Get PDF
    This paper takes a colossal look at the function and performance of trade unionism in a developing nation with a special emphasis on West Africa as a whole and Nigeria iJ;l particular. It began with a broad definition of trade union in an ordinary sense and from a legal perspective. This was followed by a general review of the history of trade \ unionism in Nigeria and West Africa from 1912 to 1938,1938 to 1976 and 1976 to date. Some of the notable unions during the period of 1912 to 1938 were the Railway Workers' Union led by Pa M.A.O. Imoudu, the Nigerian Union of Teachers and the Nigerian Marine African Workers' Union. The unionism from 1976 to date on the other hand witnessed vibrant, radical and purposeful leaders like Hassan Sunmonu, David Ogeli, Ali Chiroma, Pascal Bafyau and Adams Oshiomhole. The paper thP.n revealed that the functions and objectives of trade unions can be classified under economics, political, educational and social activities. It was further revealed that workers nom1.ally join unions because union is better placed and stronger than the individual worker with financially and otherwise, in promoting and defending the terms and conditions of employment. The paper concluded by emphasizing that the trade unions have a vital role to play not only in the management of industrial relations but also in the progress of the community

    Legal Aspect of Building Maintenance Works

    Get PDF
    This paper highlights the legal face t s of maintenance practice with special emphasis on Building. It begins with an overview of building maintenance and proceeds to identify the legal implications for owners and occupiers of buildings . This is done.by reviewing Section 72 of both the Housing Acts 1961 and 1969 of the United Kingdom, the Joint Contract Tribunal and the tort of negligence. The paper also takes a look at the building deterioration and liability in law and again highlight s the defenses that are available to occupiers/ repair contractors. These include the act of God, consent of the plaintiff, common benefit of the plaintiff and independent act of third party. The paper also takes a look at nuisance as a whole. It concludes by recommending a thorough knowledge of the conditions binding on the parties so as to reduce the possibility of disputes that normally arise among the concerned parties

    The Use of Large Unskilled Labour Force for Non-Traditional Residential Projects in Nigeria

    Get PDF
    This paper contents its attention on the large use of unskilled labour force for non-traditional residential buildings in particular and for the construction works in Nigeria as a whole. The writer notes wit h sadness that a major unemployment of all categories of workers in the construction .industry especially the unskilled ones is now on the increase, unlike before when the construction industry used to be the largest industry in the nation employing an appreciable proportion of the work force . The reason adduoed £or this is as a. result of the non reflection of indigenisation in moat of the architectural designs and the non patronisation of our indigenous contractors which in turn leads to mass use of mechanical plants and other sophisticated but costly constructional items . items thereby rendering thousands o£ able bodied men and women 1n the construction sites redundant. It is noted further that this l)q"'"' ~ development has lead to increase in crime rate in the country and a drastic reduction in construction profits especially when one views the high exchange rate used in procuring these equipment and the overall maintenance costa. Towards reversmg from this ugly practice therefore, the need for the use of unskilled labour force is particularly stressed and useful suggestions towards realizing this goal are discussed in this manner

    A Comparative Study of the Time and Cost Performance of Labour-Only Subcontractors in the Construction Industry in South Western Nigeria

    Get PDF
    The main contractors are continuously involved in a process of transforming inputs (materials, labour and- capital} into outputs such as constructed faci lities but they are usually accompanied by subcontractors and financial institutions among other firms. This study therefore examined the performance of labour-only subcontractors in the Nigerian construction industry. The principal objective was to find if any significant difference exists between the time and cost performance of these speciality contractors. In achieving this objective, one hundred questionnaires were distributed to each of the four categories of respondents in the Southwestern region of Nigeria. 75, 88, 56 and 42 questionnaires were respectively filled and returned by the main contractors, labour-only subcontractors, clients and consultants in the study area. Descriptive, parametric and non parametric statistical techniques were used for the analysis. Results indicated that significant difference exists between time and cost performance of labour-only subcontractors. Their mean scores were 4.30 and 3.29 respectively. The labour subcontractor performed creditably well in project delivery (time) but there is always cost overruns when compared with the initial estimates of the projects. It was also discovered that subcontractors' time performance is sometimes at the expense of work quality as a result of the speedy execution of work at hand in order to pave way for another engagement. It is therefore suggested that project monitoring and supervision should be given a priority attention if this procurement method is to achieve its expected success

    Risk Analysis and Management in Technological Project

    Get PDF
    The paper discussed the technological industry ' s perception of risk associated with its activities and the extent to which the industry uses management techniques. This was achieved on the basis of oral interviews conducted on a random sample of thirty (30) respondents comprising of technologists and contractors / suppliers in Oyo and Osun States. The results showed that though, little is relatively known about risk management among the technologists and contractors, greatest priority is still attached to financial and contractual risk respectively in the technologicaql industry. It then concluded that risk management is essential to technological activities in minimizing losses and enhancing profitability

    Building Failure and Collapse in Nigeria: the Influence of the Informal Sector

    Get PDF
    The occurrence of building failure and collapse has become a major issue of concern in the development of this nation as the magnitudes of this incident are becoming very alarming. This paper therefore examines the incidents of building failure/collapse in Nigeria. By focusing on six major states from each of the six geo-political regions of the country, the paper examined the contributory role of the informal sector to this decadence. The study indicated that the building failure and collapse stem principally from hasty construction, low quality workmanship, poor supervision, inexperience (use of incompetent hands), ignorance, evasion/ non-compliance with building regulations and non enforcement of building quality, standard and control on construction site/market. This study has revealed that more than 70% of the reported cases of building collapse in Nigeria stemmed from the informal sector. It further showed that 70-0%, 23-3% and 6.7% of the reported cases occurred in private, public and corporate organizations respectively. In this paper, it is concluded that it is important to educate or giver further advice to the government and the governmental agencies to be proactive to their duties in order to curb/reduce this negative image

    Millennium Development Goals and the Impact of Registration on the Performance of Construction Subcontractors in Nigeria

    Get PDF
    Arising from the quest to achieve sustainable built environment and the millennium development goals in developing countries, the study examined the influence of registration on the performance of subcontractors in the Nigerian construction industry. The principal objective was to find if any relationship exists between registration and the performance of subcontractors in the Nigerian construction industry By focusing on three commercial nerve centers oft he country (Lagos, Abuja and Port Harcourt), 90 main contractors wer~ randomly selected from the study population of 880 in the register of the Federal Registration Board of Nigeria, 96 subcontractors, 90 clients and 92 consultants were also randomly selected from the population. Descriptive and inferential (Chi-square probabilities) statistical techniques were used for the analysis. The results showed that the registration had no significant effect on the overall performance of subcontractors on construction sites in Nigeria (x = 2. 07, P < 0. 05). The results also indicated that majority of the main contractors (49.4%) give notification to these specialty contractors when they are needed on site. On the other hand, a paltry number of the contractors (33.3%) affirmed that it is left for the subcontractors to monitor the progress of their bidding and final selection on sites. The study concluded that for a meaningful monitoring, sincere attention should be shifted towards registration of subcontractors with the relevant professional bodies and that competitive bidding should be encouraged among the subcontractor
    corecore